Agent Studio

Construction

Agents that report the jobsite, coordinate trades, and file safety docs.

Book a demo

Streamline

Connect the jobsite, trades and safety in one place, with any model.

Connect your jobsite apps

Daily reports, RFIs and safety packs live in mail, Drive and the channel. Connect them once so the superintendent isn't the filing cabinet.

Jobsite

Daily logs, photos and punch in Drive, Slack and Sheets.

Trades

Sub mail, RFIs and change chatter in Outlook and Teams.

Safety

JSAs, incidents and toolbox talks in Drive and SharePoint.

Schedule

Lookaheads, deliveries and inspections in Sheets and Asana.

Become efficient

Hand off the work that repeats.

Make the jobsite efficient

Daily reports, trade chases and safety packets run after every shift. You walk the site.

Daily log

Close the day without rewriting the log

Turns photos, weather, manpower and Slack notes into the daily report owners actually read.

Log Agent

Log is in Drive. Manpower and deliveries are in. Two RFIs still have no answer — that's you.

Bldg B · 8 May

Daily log

  • Manpower

    42 on site

    Logged
  • Deliveries

    Steel · 7am

    Logged
  • Weather

    Light rain · 14:00

    Logged
  • RFI-118 / 121

    Open 5 and 3 days

    Your call

Trades

Chase the sub before the lookahead slips

Reads trade mail against the three-week lookahead and drafts the nudge.

Trade Agent

Rebar is confirmed. Embeds have no shop drawing. I chased the supplier. The pour date needs you.

Pour · 15 May

Lookahead

  • Rebar

    On site Thu

    Confirmed
  • Pump

    Booked 6am

    Confirmed
  • Embeds

    No shop drawing

    Chased
  • Pour date

    Hold vs move

    Your call

Safety

File the JSA before the crew steps off

Builds tomorrow's JSA from the lookahead, last incidents and the trade list.

Safety Agent

JSA is in Drive. Fall protection and pick plan are in. Sign-in sheet still needs the ironworkers' names.

JSA · steel Thu

Safety

  • Task

    Steel erection · L3

    Ready
  • Controls

    PFAS + pick plan

    Ready
  • Weather

    Wind 18 mph

    Noted
  • Sign-in

    Crew list incomplete

    Your call

RFIs

Chase the answer before the pour waits

Tracks open RFIs against the lookahead and drafts the chase to the architect or engineer.

RFI Agent

Two RFIs are closed. RFI-118 still has no sketch. I chased the architect. The hold needs you.

RFIs · pour Thu

Lookahead

  • RFI-109 embeds alt

    Answered 6 May

    Closed
  • RFI-114 mix design

    Answered 7 May

    Closed
  • RFI-121 slab edge

    Open 3 days

    Chased
  • RFI-118 sketch

    Open 5 days · critical

    Your call

Submittals

Keep the package moving without the paper chase

Files returned stamps, flags overdue reviews and drafts the reminder to the reviewer.

Submittal Agent

Three are stamped. Embeds shop drawings are 4 days late. I nudged the reviewer. The resubmittal needs you.

Submittals · Bldg B

Drive

  • Rebar mill certs

    Stamped 6 May

    Approved
  • Concrete mix

    Stamped 7 May

    Approved
  • Embeds shop

    Review late 4 days

    Nudged
  • Waterproofing

    Comments · resubmit

    Your call

Grow

Keep the job moving, and take the next one.

Start growing the jobs

Lookahead health, RFI aging and safety themes are ready before the owner meeting. You decide what to staff.

Manpower, RFIs and inspections vs the lookahead, with the one activity that slipped.

Plan %

92%

+4pt

Open RFIs

11

−3

Inspections

5/5

0

Insights

Steel is a day ahead. Two RFIs on embeds are the only thing that can move Thursday's pour.

Sources

Ranks deliveries, RFIs and inspections by whether they sit on the critical path.

High

Embeds · no shop drawing · pour Thu

High

RFI-118 · open 5 days

Medium

Wind · 18 mph Thursday

Low

Rebar · confirmed Thu

24

Activities this week

4

On the critical path

2

Already recovered

Sources

Groups observations and incidents by trade, location and control so toolbox talks stay specific.

HitsTradeControl
Edge protection6SteelPFAS
Housekeeping4AllDaily
Lifts2MEWPSpotter
Sources

Ranks upcoming bids and extra work by manpower, start date and win odds so you staff the real pipeline.

B

Building C fit-out

Extra work · start 19 May · 92% fit

Team approved
R

Riverside school

Bid due 22 May · 81% fit

Your call
W

West dock

Change order pending · 68% fit

Your call
C

City hall annex

No start date · 31% fit

Agent drafted

8

Pursuits this month

3

Can start a crew

1

Needs a hire talk

Sources

Ready when you are.

Let agents handle the busywork in construction so you can focus on growth.