Agent Studio

Manufacturing

Agents that report the line, chase suppliers, and keep quality docs current.

Book a demo

Streamline

Connect the plant, suppliers and quality in one place, with any model.

Connect your plant apps

Shift reports, supplier mail and quality files live in different systems. Connect them once, then ask across the floor.

Production

Shift notes, line counts and downtime in Sheets, Drive and Slack.

Suppliers

Outlook, Gmail and Teams for POs, delays and follow-ups.

Quality

NCRs, CAPAs and inspection packs in Drive and SharePoint.

Ops cadence

Daily standups, OEE snapshots and the board pack.

Become efficient

Hand off the work that repeats.

Make the plant efficient

End-of-shift reports, supplier chases and quality packets run on a schedule. You sign the exceptions.

Shift report

Close every shift without chasing notes

Pulls counts, downtime and scrap from Sheets and Slack into a report the next supervisor can trust.

Shift Agent

Report is in Drive. Scrap is 1.4%. Two stops need a cause before the 8am board.

Line 2 · night shift

Sheets + Slack

  • Output

    1,842 units · plan 1,800

    Filed
  • Downtime

    38 min · changer jam

    Logged
  • Scrap

    1.4% · above 1.0% cap

    Flagged
  • Cause code

    Two stops still blank

    Your call

Suppliers

Chase late POs before they hit the line

Reads supplier mail, flags slips against the production week, and drafts the follow-up.

Supplier Agent

Two shipments slipped. I drafted the chase. The resin lot needs you — it stops Friday's run.

Open POs · this week

Outlook

  • PO-4412 fasteners

    ETA Tue · on track

    Watching
  • PO-4418 labels

    Carrier delay +1 day

    Chased
  • PO-4421 cartons

    No ASN yet

    Chased
  • PO-4401 resin

    Misses Friday run

    Your call

Quality

File the NCR before the audit asks

Turns inspection notes into an NCR pack in Drive, with photos, lot and owner.

Quality Agent

NCR-208 is in Drive. Lot and photos are attached. Containment still needs a sign-off.

NCR-208 · paint

Quality

  • Photos

    6 from the cell

    Attached
  • Lot

    A19-440

    Logged
  • Owner

    Paint lead

    Assigned
  • Containment

    Hold ticket unsigned

    Sign off

Standup

Put the 8am board pack in one place

Pulls OEE, scrap and open stops from Sheets and Slack so the standup is a list of decisions.

Board Agent

Pack is in Drive. Line 2 is on plan. Line 4 still has two uncoded stops — that's you.

Board pack · 8 May

Sheets + Slack

  • Line 2 OEE

    78% · plan 75%

    Ready
  • Line 4 OEE

    61% · two stops

    Flagged
  • Scrap

    Paint · 1.4%

    Noted
  • Cause codes

    Line 4 still blank

    Your call

Maintenance

Open the work order before the line waits

Turns a downtime note into a work order with asset, photos and a suggested spare, then queues it for sign-off.

Maint Agent

WO-4418 is in Drive. Photos and the spare are attached. Isolation still needs a supervisor.

WO-4418 · changer

Maintenance

  • Asset

    Line 2 changer

    Logged
  • Photos

    4 from the cell

    Attached
  • Spare

    Kit 12 in crib

    Reserved
  • Isolation

    LOTO unsigned

    Your call

Grow

See the plant clearly, then add capacity.

Start growing the plant

OEE, supplier risk and quality themes are ready before the board. You decide where to put the next shift.

Output, downtime and scrap across lines, with the one stop that moved the week.

OEE

74%

+3pt

Downtime

6.2h

−1.4h

Scrap

1.1%

−0.2pt

Insights

Line 2 changeovers dropped 11 minutes after the new kit. Line 4 still eats Monday.

Sources

Ranks open orders by line impact, ASN and promised date so buyers work the real threats.

High

Resin PO-4401 · misses Friday run

High

Cartons PO-4421 · no ASN

Medium

Labels PO-4418 · +1 day

Low

Fasteners PO-4412 · on track

18

Open POs this week

4

At risk of the line

2

Already recovered

Sources

Groups NCRs by cell, lot and owner so you fix the process, not just the unit.

NCRsLineOwner
Paint inclusion9Line 2Paint
Torque miss5Line 4Assembly
Label mix3PackWarehouse
Sources

Ranks lines by demand, overtime and changeover so you add hours where the order book is real.

L

Line 2

Backlog 6 days · OT 4h · 94% fit

Team approved
L

Line 4

OEE 61% · two stops · 71% fit

Your call
P

Pack

Label mix · Saturday? · 68% fit

Your call
L

Line 1

On plan · no extra · 34% fit

Agent drafted

4

Lines reviewed

2

Can take a shift

1

Needs a hire talk

Sources

Ready when you are.

Let agents handle the busywork in manufacturing so you can focus on growth.